The Southeast Asia–Japan 2 (SJC2) submarine cable system spans 10500km, connecting 11 cable landing stations in Singapore, Thailand, Cambodia, Vietnam, Hong Kong, Taiwan, mainland China, Korea and Japan.
The SJC2 cable was initially designed with eight fibre pairs, using 400 Gbps line rate × 45 wavelengths DWDM technology to achieve 18Tbps per fiber pair and a total system capacity of 144 Tbps.
SJC2 consortium includes China Mobile International (CMI), Chunghwa Telecom (CHT), Donghwa Telecom (DHT), Meta (Facebook), KDDI, Singtel, SK Broadband (SKB), Telin, TICC (True) and VNPT.
SJC2 consortium selected NEC as the turn-key supplier.
The initial cost of SJC2 cable system is about US$440 million. While its earlier generation SJC cable system cost about USD400 million for an intial design capacity of 28Tbps and cable length of 8900 km.
It's reported that TRUE spends around Bt3.6 billion (approximately USD110 million) on SJC2 cable system and acquires 9Tbps (1/16 of the system capacity).
The SJC2 cable system was ready for service on July 16, 2025.