Submarine Networks Submarine Networks
Submarine Networks Submarine Networks
  • Home
  • Systems
    • Trans-Atlantic
    • Trans-Pacific
    • Trans-Arctic
    • Intra-Asia
      • APCN
      • APCN-2
      • EAC-C2C
      • FNAL/RNAL
      • TGN-IA
      • APG
      • ASE
      • Cahaya Malaysia
      • SJC
      • KJCN
      • MCS
      • MIC-1
      • TIC
      • i2i
      • WAC
      • TIS
      • BLCS
      • BDM
      • DMCS
      • GBI
      • TSE-1
      • ICX
      • BBG
      • SeaX-1
    • Intra-Europe
    • Asia-Europe-Africa
      • PEACE
      • AAE-1
      • EASSy
      • FALCON
      • FLAG FEA
      • SAFE
      • SEA-ME-WE 3
      • SEA-ME-WE 4
      • SEA-ME-WE 5
      • SEACOM
      • RJK
      • RJCN
      • HSCS
      • IMEWE
      • EIG
      • TGN-EA
      • MENA
      • TEA
      • GBI
      • G2A
      • Arctic Fiber
      • IOX
    • South Pacific (Australia-US)
      • Pacific Fibre
      • PPC-1
      • Southern Cross
      • Telstra Endeavour
      • Optikor Network
      • TGA
      • Hawaiki Cable
    • Asia-Australia
      • AJC
      • ASC
      • SMW3
      • ASSC-1
      • INDIGO
      • PNG National
      • PPC-1
      • Trident
    • Eurasia Terrestrial
    • North-South Americas
      • Seabras-1
      • MONET
      • AMX1
      • BRUSA
      • Curie
    • Brazil-Africa
      • SACS
      • SAIL
      • SAEx
    • Africa West Coast
      • WACS
      • MainOne
  • Stations
    • Africa
    • Asia
      • Japan
      • Korea
      • China
      • Taiwan
      • Hong Kong
      • Vietnam
      • Philippines
      • Brunei
      • Singapore
      • Indonesia
      • Malaysia
      • Thailand
      • Myanmar
      • Sri Lanka
      • India
      • Bangladesh
    • Europe
      • Russia
    • North America
      • USA-West Coast
      • USA-East Coast
      • USA-Guam
      • USA-Hawaii
    • South America
    • Oceania
      • Australia
      • American Samoa
      • Samoa
      • French Polynesia
      • New Zealand
      • Papua New Guinea
      • Fiji
  • News & Views
    • Insights
    • News
  • Events
    • Submarine Networks World 2026
  • Login
    • Submit an article
    Show
    • Create an account
    • Forgot your username?
    • Forgot your password?

Select your language

  • 简体中文(中国)
  1. Home
  2. Systems
  3. Intra-Europe
  4. GO-1

GO-1

The GO‑1 Mediterranean cable system is a 290 km, 4‑fiber‑pair submarine cable linking GO‘s St Paul’s Bay Cable Landing Station (CLS) in Malta to the Mazara del Vallo CLS in Sicily, Italy.

The GO-1 cable system, supplied by Alcatel Submarine Networks (ASN), was originally commissioned in 2008 and became fully operational in early 2009. It was designed with an initial DWDM capacity of 2x10 Gbps.

The GO-1 cable system is privately owned and operated by GO p.l.c., Malta’s leading telecommunications provider, and was built to significantly increase GO‘s international capacity while ensuring network resiliency as the country’s first cable approached the end of its economic life.

The cable lands at the Mazara del Vallo CLS in Sicily. GO originally partnered with Interoute (whose assets were later acquired by EXA Infrastructure) to land the cable at Interoute’s Sicilian facility, and the cable connects directly to Interoute’s extensive pan‑European fibre network. The landing party at Mazara del Vallo provides colocation, backhaul, and maintenance services for the cable.

MOGOSC Upgrade (June 2026)

In June 2026, GO announced the MOGOSC (MOdernisation of the GO‑1 Submarine Cable) project – a strategic infrastructure upgrade designed to enhance Malta’s connectivity to Europe and strengthen the country’s digital resilience.

  • Total eligible costs: €1.56 million
  • EU contribution: €778,636.50 (50% co‑funding) through the Connecting Europe Facility (CEF) Digital Programme
  • Scope: Replacement of existing submarine line terminal equipment (SLTE) with next‑generation transmission platforms at both cable landing stations, delivering significantly greater capacity, enhanced cybersecurity, and full alignment with European strategic infrastructure requirements.
  • Initial capacity after modernisation: minimum 400 Gbps of aggregated capacity, designed to scale to multiple terabits per second.
  • Expected deployment start: late 2026
  • Target completion: September 2027

 

Articles
Title Published Date Hits
GO Modernizes GO-1 Submarine Cable with EU Fund
09-06-26 1114
Submarine Networks World

Latest Articles

  • European Commission Mobilized up to €623 million for Digital Connectivity with Central Asia
  • EXA Infrastructure Selects IT International Telecom for Marine Installation of EXA Meridian
  • UK Announces £90 million Investment for Royal Navy to Protect Undersea Cables
  • FCC Overhauls International Section 214 Authorization
  • PISCES Co-Founder Equitix Secues €500M APG Capital Mandate
  • Stavian Group and Midas Capital Sign $1 Billion MOU for Subsea Cable and Digital Infrastructure
  • Fueling the AI Boom: Thailand’s NT Proposes THB 16.1B ($480M) for Four New Subsea Cables
  • Breaking the Gray-Zone Shield: Finland Jails Cargo Ship Officers in Landmark Subsea Cable Sabotage Conviction
  • About Us
  • Terms of Use
  • Privacy Policy
  • Sponsor & Advertise
  • Contact Us
  • Home
  • Systems
  • Stations
  • News & Views
  • Events

© 2011 - 2024 Submarine Networks Co., Limted. All Rights Reserved.