Select your language
The Aurora submarine cable system is a high-capacity, private transatlantic express cable spanning approximately 7,268 kilometers directly between the United States and Denmark.
The Aurora submarine cable system is privately developed, owned and operated by Meta, through multiple subsidiaries, including:
Aurora's architecture physically separates beachfront Cable Landing Stations (housing Power Feed Equipment / PFE) from inland Data Center Points of Presence (housing Submarine Line Terminal Equipment / SLTE):

The Aurora submarine cable system is configured with 24 fiber pairs utilizing Spatial Division Multiplexing (SDM) and high-spectral coherent optical technology, achieving a system design threshold near 497 Tbps. Deployed as a private, non-common carrier cable system, Meta retains ultimate operational authority over the subsea wet plant while managing SLTE optical terminal equipment directly within its designated data center PoPs in Piscataway, NJ, and Esbjerg, Denmark.
The Aurora submarine cable system forms part of Meta's private subsea backbone to support high-throughput cloud synchronization, application traffic delivery, and artificial intelligence (AI) large language model (LLM) workload processing across its North American and European data center campuses, bypassing traditional Western European bottleneck landing corridors (FLAP region: Frankfurt, London, Amsterdam, Paris).
Meta formally filed with the U.S. Federal Communications Commission (FCC) for the cable landing license application on August 17, 2026.
The Aurora submarine cable system is targeted an operational Ready-for-Service (RFS) date of January 15, 2028.
| Parameter | Specification |
|---|---|
| Cable System | Aurora |
| Cable Length | ~7,268 km |
| Fiber Pairs | 24 Fiber Pairs |
| Design Capacity | ~497 Tbps (~20.7 Tbps per fiber pair) |
| US Facilities | CLS / PFE: Manasquan, New Jersey SLTE PoP: Piscataway, New Jersey (Data Center PoP) |
| Denmark Facilities | CLS / PFE: Blaabjerg, Denmark SLTE PoP: Esbjerg, Denmark (Data Center PoP) |
| Owner / Developer | Edge Cable Holdings USA, LLC (wholly owned subsidiary of Meta Platforms) |
| System Type | Open Cable System / Private Non-Common Carrier |
| FCC Filing Date | August 17, 2026 |
| Target Ready-for-Service (RFS) | January 15, 2028 |